Khaled Shatwi

Electrical Engineer - Saudi Electricity Company

Name : Khaled Ayedh Al-Shetwi
Nationality: Saudi Arabia
Marital status : Married
Work Address :
Saudi Arabia
Saudi Electrical CO.
Mobile No.: 0506748560

Education

* 1996 – 2000 Bachelor In Electrical engineer (King Fahd University
ofPetroleum and Minerals)
* 2004-2007 Master in Quality managements (Technical Arabic Academic)
* 2002-2006 Master in electrical engineer (Azhar University)
Thesis is discuss about “ study parameters affecting on
protection transmission lines from lightning in tropical area”
* 2006- 2010: Doctor Philosophy in Electrical Engineer (Azhar
University)
Thesis is discuss about "Improving the Lightning Protection of
Transmission Lines in Tropical Areas with High Resistivity Soils
Through Improving the Ground Systems"

Experiences and Work details

2001 – 2003 In SEC
 Supervise project which is the expansion of existing Asir station to
include one unit of one power block. The power block consists of the
following elements: one gas turbine, 3 compressors, 4 combustion
chambers, 5 air exhaust turbine, 6 generators and 12 steam turbine
generators, 10 parts as condensate pumps, heaters, etc. depending on
the design of the power block unit. The energy capacity is 70 MW and
over SR 120 million costs.
 Supervise Contract for addition unit of Qunfuza generation plan
where the 40 MW energy capacity comprising one power block. it
consisting 1 gas turbine, 1 steam generators, and control systems,
together with balance of plant (transformers, cooling towers, air intel
chillers, export high voltage switchyard, water storage and water and
wastewater treatment facilities). The cost was over SR 70 millions
2003 – 2005 In SEC
 Supervise transmission lines and networks projects up to 132 and 33
kV (Asir South Net, Samak Net, village on the line between Saudi
Arabia and Yamin, Baha villages, Jizan villages, Asir villages)total
budget of these projects more than SR300 million.The work includes
inspection materials, installation, test and commissioning and issue
technical and final certificate.
 Attend test of equipments of previously projects in factory and sign of
wetness.
2005 – 2007 In SEC
 Supervise substation projects (Khamis SouthS/S, TendahaS/S, Zafeer
S/S, SagrahS/S)The work includes initiate contract document,
inspection materials, installation, test and commissioning and issue
technical and final certificate.
 Attend test of equipments of previously projects in factory and sign of
wetness.
 Projects of Sub-transmission lines between substations (Batha S/SRufaidah S/S sub transmission line, Khamis North S/S -Tandaha S/S
sub transmission line).
 The general evaluation of work in these years was Very good.
2007 – 2010
 Supervise substation projects 132/33/13.8 kV (Mandarah S/S,
Sharorah S/S, Ballesmer S/S, Hamid S/S, Mandag S/S, Darb S/S,
Ahad Al-Masaraha S/S, Batha S/S). The contractors are Siemens Co.,
ISCOSA co., Jihaz CO., Haif Co and Masharq Co.The total budget of
these projects more than SR160 million. The procedures work consists
of initiate contract document, inspection materials, installation, test
and commissioning and issue technical and final certificate. Each
project work include approve plans draws, design submits, test plans,
material and equipment specifications and electrical calculations.
 Also supervise distribution O/U networks (Jizan East Net., North Asir
Net. ….). The total budget of these projects more than SR220 million.
The work includes initiate contract document, inspection materials,
installation, test and commissioning and issue technical and final
certificate.
 Attend test of project equipment in factory and sign of wetness.
 Sometimes take responsibility leaders in some departments like,
Distribution Engineer Dep., Khmis consumers unit.
 The general evaluation of work in these yearswere Excellent.
Management of projects, contract negotiation and administration,
contacts with Clients, suppliers, professionals, manufacturers,
Government institutions. Had participated in the execution of various
electrical works, i.e. Rehabilitation and construction of power
substations, underground cables, overhead distribution lines, sub
transmission lines (up to 35 kV). Prepare contract document, e.g.
scope of work, plan draw, schedule of materials quantity, payments
conditions..etc. The general evaluation of my work in this year is
Excellent
2010 – 2014
 Manager of electrical utility of Makkah unit that consist of repair
short circuit of trip line HV or LV , issue billing of consumers, reduce
the debt of utility, install metering boxes of consumers, progress
special service of consumer, construct projects new HV lines.
2015 – 2022
 Expert of Distribution in Plan Department in Riyadh Center that
consist of consultant of strategic plan, contracts initiate and review,
analysis loads, construct HV projects.

15:35 - 15:50

22 May 2023 Session Three

Study Parameters of Dust Weather Affecting on Solar PV System in Isolation Areas

Electrical Engineer
Saudi Electricity Company

15:35 - 15:50

22 May 2023 Day 1

Study Parameters of Dust Weather Affecting on Solar PV System in Isolation Areas